When we at Mayanot, think about all that our team has accomplished this past year, we feel unbelievably grateful. Grateful to have such an amazing and supportive community behind us, propelling us forward. Generously pushing us ahead and ensuring the mission of Mayanot, to empower young Jews through education and build a new generation of leaders, is thriving.
This past year of 2020 has been challenging, no doubt about that, but Thanks to G-d’s help and the outpouring of love from our Mayanot family and thousands of supporters, the Mayanot World Center project has not only continued building throughout the year, but we have also successfully managed to keep to our target opening date of Fall 2021.
Take a look at how far our team has come this year and what an amazing transformation has taken place. Thank you for sticking with us and being active participants in the process. We look forward to what 2021 will bring.
Check out the video and photos below.
Feel inclined to tell the world about the amazing work Mayanot is doing? Feel free to share and tag us, @mayanotmen @mayanotwomen

Entrance floor lobby 
Upper floors

Initial opening for the stairway 
Walls going up

Lobby area 
Lobby walls erected

Upper floor: before the walls 
Upper floors: initial wall build 
Upper floors: after wall construction

Safety Room Initial build 
Temporary wood structure 
Metal Wires installed 
Cement poured and wood removed

Electric and plumbing installation 
Wall prep and drywall complete 
Installing air ducts

Basement removal of the old pipes 
Replacing new pipes 
Basement view before walls 
Building the basement safety room 
Finishing stage II of the basement safety room 
Basement, left side section, wall completion

Initial opening of commercial kitchen 
Continuation of expansion process

Rooftop after center construct is dismantled 
Rooftop cleared and plumping prep assembled
