The summer is upon us and we are enjoying the warm weather here in Israel. Our team is continuing to install the much needed air conditioners, on all floors, closing up the ceiling with dry wall, painting all dorm rooms, and even installing the hanging shelving in over 50 rooms. The safety room electric is being finished and the outlets have already been put in. It is amazing to see everything coming together.
Enjoy the July photos and videos below.
Electric outlets are connected Dorm room with finished ceiling
Rooftop infrastructure installed Building the rooftop floor
The dorm room pictured after the shelving has gone up and the trial pieces have been chosen.
Dorm room entry way Washing station and closets Dorm room shelving
Basement progress:
Prepping for the main stairs to be installed Installing electric in the industrial kitchen area