These are not easy times here in Israel, but we are optimistic for the future and are pushing forward with the construction of the building.
The importance for a Center like Mayanot to provide us with what we need most, young Jewish educated leaders who can stand up for Israel, the Jewish People and our Judaism.
As always thank you for supporting our efforts to nurture a love for Torah, the Jewish people, and the Land of Israel and make a lasting and sustainable impact.
We can’t wait to show you how the renovation of the New World Center is progressing, view the photos and video below.

Drywall installation in the dorm rooms. All Air conditioning units installed on upper floors. All upper floors ceiling drywall completed.
The ceiling installation of the future Beit Midrash and classroom area on the entrance floor.
Electric installation happening, under the floor, on the entrance level.
All the large safety rooms are coming along, as well.
The concrete roof of the new kitchen area in the process of being constructed.
The view of the basement reconstruction from inside. While the concrete is drying the beams hold up the ceiling.
The rooftop air conditioning units and plumbing being installed.