Our team is continuing to make major developments at the New Mayanot World Center this month. Checkout the video and images below.
The multiple balconies facing the Nachlaot neighborhood. After the reconstruction.
Ceiling infrastructure being finished on all upper floors. Installation of the:
- Lighting and electric;
- Plumbing;
- Cameras and internet;
- Sprinkler system;
- Air conditioning and heating system.
Piping installation happening. Ceiling casings are installed. Wiring being pulled through, by one of our electricians
Entrance floor ceiling infrastructure being worked on:
Our team, ensuring all the infrastructure is safely installed on the ceilings and the ‘geves’/ drywall can be easily attached to hide everything happening above.
Plastering the walls in preparation for the paint on all upper floors:
Getting ready to paint all dorm rooms, classrooms, offices and student lounges on all upper floors
of the Mayanot World Center.
The basement, commercial kitchen space, moving to the next phase of construction from digging to reinforced concrete and waterproofing the walls.
Having dug out this new space from the original bedrock, our team installed the new pipes.
Smoothing and sealing the walls and floor.
Waterproofing the entire space, so no moisture is able to come in whatsoever.
We are looking forward to painting all the upper floors soon, covering up the ceiling wiring and pipes, installing the lights and working on the main floor entrance stairs!
See you next month, with a slew of new updates!